Current projects:

  • Creation of mathematical dependencies of strip heating for galvanizing plant control model 2


  • Determination of the temperature of pig iron in the molten iron chute - 2nd phase


  • Preparation of Gas Technical Standards - Natural Gas

Archive of projects:

    2022:

  • Study - energy assessment and modernisation of continuous annealing line no. 1

  • Technical assistance: design of flow throttling of emergency water supply for pusher furnaces and modulation of water flow to individual blast furnaces

  • Determination of the temperature of pig iron in the molten iron chute - 1st phase


  • 2021:

  • Verification of tightness of seals


  • 2020:

  • Mathematical models for determining the thermal efficiency of thermal aggregates


  • 2018:

  • Analysis of steel solidification (freezing) in immersion tubes

  • The research of the status and possible benefits for the new control of the non-oxidation and reduction furnace of galvanizing line no.2

  • Possibilities of reducing energy consumption and increase productivity of aluminium remelting


  • 2016:

  • Regulation of the natural gas supply to the reduction zones of the galvanizing line


  • 2015:

  • Determination of pressure losses in the gas, combustion air and flue gas distribution system of wind heaters of blast furnance no.3


  • 2014:

  • Optimisation of the combustion process of pusher furnaces


  • 2012:

  • Heat balance analysis of furnaces of the galvanizing line no.2

  • Heat balance of the sintering process on belt for agglomerate and simulation of the flue gas flow with regard to burner system changes


  • 2010:

  • Energy analysis of a rotary furnace for aluminium scrap processing

  • Energy balance of remelting